Basis Data:
Number of measuring points (maximum 200)
Unit of length
Meter (m)
Foot (feet, ft)
Main Table:
Reading
Results
Name point
Backsight (m)
Intermediate sight (m)
Foresight (m)
Elevation bench mark (m)
Rise/
Fall (m)
Reduced level (m)
Adjustment
(m)
Adjusted reduced level (m)
1
2
+0.860
150.627
+0.001
150.628
3
-0.120
150.507
0.000
150.508
4
-0.646
149.861
0.000
149.862
5
+0.852
150.713
0.000
150.714
6
+1.437
152.150
0.000
152.151
Error evaluation:
Calculate allowable misclosure
Section
Sum backsights (m)
Sum foresights (m)
Difference
∑backsights/∑foresights (m)
(actual value)
Difference
bench marks
first / last point (m)
(nominal value)
Nominal-actual value difference (misclosure) (mm)
BM 1 to BM 2
3.717
2.977
0.740
0.741
1
BM 2 to BM 3
6.293
4.650
1.643
1.643
0